Now I removed the mille top yoke and drilled out the
security bolt starting with a small drill and worked my way
up till the head broke away from the thread
Next was a trial fit for the top yoke and bars
I then rerouted the choke cable above the frame and followed the throttle cables
The following pictures show the routing of the cables and wiring
Front fairing fitted along with clutch and brake lines
Decided I didn't like the air intake scoops,
they looked like they would swallow a whole bird in one let alone bugs etc
So a trip to the local hardware store (B&Q) turned up some ali mesh
an exact match to the mesh on the side covers also as a bonus
ali tube that just so happens to come with a id to suit M6,M8,M10
real handy for making spacers etc
The above mesh was cut to fit and glued with silicone to the inner duct only
Some pictures of bike so far
First fitting after paint